Northpine Christian College

 

Project overview

 

Spantech has constructed a number of projects at the Northpine Christian College, Dakabin, just north of Brisbane.

 

Client
Northpine Christian College

Project
Multipurpose Hall, Junior School Shade Structure, Senior School Shade Structure

Location
Dakabin, Queensland

Architect
Spantech

Principal contractor
Spantech

Multipurpose hall

Northpine Christian College commissioned Spantech to design and construct a building in two stages to meet the immediate and future needs of a growing school.

Stage 1 was an expansive shade structure over the existing Junior School basketball and netball courts, located adjacent to the school’s 25-metre swimming pool. The layout and structural steel of the 38 m x 38 m structure was designed to accommodate future expansion.

Stage 2 was to enclose the existing shade structure to create a state-of-the-art indoor sports and performance hall with funds made available under the BER program.

An innovative pre-cast concrete wall system, plus windows and louvres, were added to the existing shade structure to enclose the building. Other elements such as a new feature entrance, an insulated acoustic ceiling, a new concrete slab and point-elastic sports floor, retractable sports equipment and a court dividing net were added. The building was extended to incorporate a performance stage with lighting and sound systems, and associated storage and back stage areas.

By working closely with the school and carefully considering its current and future needs, Spantech was able to deliver a solution that met the school’s requirements and cash flow.

Junior School shade structure

While the multipurpose hall was being constructed, Spantech erected a shade structure over an existing concrete play area. The simple shade structure has become a well used central feature of the junior school.

Officially opened on 31 July 2007, Spantech designed and constructed this structure to provide year-round shade and weather protection for the students at Northpine Christian College.

Senior School multipurpose shade structure

The Spantech arch spans 34 metres from eave to eave and is 32 metres long, covering two existing basketball courts. Rising to an apex height of 8.8 m from galvanised steel beams supported on columns that stand 3.6 m high, this geometry provides structural economy by minimising loads and maximising protection from both sun and rain.

The arch is roll-formed from Colorbond steel and is self-supporting without need of interior trusses. It provides a pleasant appearance, maximises space under the roof, eliminates roosting places for birds and maintains the feel of the outdoors.

The addition of skylights has created soft, even light under the structure, improving visibility in fast-moving sports.

Located in a relatively limited construction area, which included existing trees and facilities, Spantech crews completed the on-site works in just four weeks with the College in session.