Spantech Awarded Major Design and Construction Contract
Client:
Project:
Location:
Completion:
|
Lismore City Council
Goonellabah Recreational Centre
Lismore, NSW
Estimated - Jan 2009 |
| Scope: |
Design and construct a community centre with indoor swimming pools, multi-purpose sporting hall and comprehensive support facilities |
Spantech has been awarded the design and construct contract for the Goonellabah Recreation Centre by the Lismore City Council.
The facility will utilise the complete Spantech System including 370 Series Panel to span the 36.4m wide sports hall, 300 Series straight panels for walls and Spanform to form the suspended slab for the mezzanine level.
The project is being designed in conjunction with Architects "Facility Design Group". It features a Pool Hall and Sports Hall joined by a Central Core.
Pool Hall incorporates:
- a heated indoor combination pool with
- 25 metre x 5 lane lap zone
- a large program zone with access ramp and
- beach entry
- separate toddlers pool
- indoor water slide
- amenities and storage facilities
- concourse shower
- access to kiosk
- spill out areas to secured open space
Multi-Purpose Sports Hall incorporates:
- a two indoor courts for
- basketball
- netball
- volleyball
- badminton, or
- indoor soccer
- tiered seating and
- extensive storage facilities
The Central Core featuring the Main Entry and Foyer includes a:
- Kiosk
- Cafe seating area and lounge/waiting area
- Control, administration, first aid and staff facilities
- Meeting room
- Youth facilities and storage
- Offices for sporting groups
- Large amenities servicing the Sports Hall
- Youth and public areas
- Parents area and child minding zone with outdoor secure play area
There is lift and stair well access to a mezzanine level where there is:
- gymnasium and fitness centre
- amenities and sauna facilities
- a secondary control zone
The new 140 car carpark that terraces down towards Tucki Tucki Creek will feature extensive landscaping.
Construction started in October 2007 with handover planned for Jan 2009.
► Latest Projects |
|

Architectural view of the Goonellabah Recreation Centre planned to be completed in October 2008

At the North East end is the Pool Hall featuring an indoor waterslide.
Images Copyright 2007 Facility Design Group
|