Builders and Suppliers of Wide Span Curved Roofs

Tenders & Current Projects
Header Image

Bernadette Centre, Lourdes Hill College

Project Scope

Spantech was the nominate subcontractor supplying the unique roof-top shade structure to the Bernadette Centre at the Lourdes Hill College.

Project Overview

For more details about this project download the Bernadette Centre – Case Study.

Related Projects

Cape Byron Rudolph Steiner School

Location: Ewingsdale NSW

Industry: Education

Date: October 2011

The multipurpose concrete court and shade structure was designed and constructed by Spantech in conjunction with architect Julie Lipset. The beams near the apex of the roof were installed to allow aerial circus training. Read more.

Townsville Christian College

Townsville Christian College

Location: 210 Palmerston St, Vincent Qld 4814

Industry: Education

Date: October 2015

Designing the new Townsville Christian College from the ground-up gave architects Nth Qld Construction Consulting the opportunity to incorporate an impressive Spantech shaded cover to link eight new classrooms. Read more.

Trinity Catholic College

Location: Lismore NSW

Industry: Aquatics, Education

Date: October 2006

Spantech designed and constructed the multipurpose sports and performance facility for this preschool to Year 12 College. The facility includes a 25 metre waveless indoor swimming pool and a 400 seat grandstand. Read more.

Marymount College

Location: 261-283 Reedy Creek Road, Burleigh Waters, Qld

Industry: Education

Date: October 2010

This distinctive architecturally designed complex includes two partially open multipurpose courts, three classrooms, a canteen, storages and amenities on both levels. Terrace seating along one court is complimented by wide tiered steps that lead up to the stage. Read more.

St Pius X School

Location: Salisbury Qld

Industry: Education

Date: October 2008

A Spantech arched roof is supported on one side by round galvanised columns, while the other side features counterlever right angled universal beams forming a verandah that defines the structure. The verandah features a full length translucent skylight and timber seating which overlooks the playground and oval below. Read more.

Kings Sports Centre

Location: Reedy Creek Qld

Industry: Education

Date: October 2012

Spantech was contracted to design a complete indoor sports facility and construct the project in stages to suit the school’s budget and planned growth. Read more.

Citipointe Christian College - Multipurpose Hall

Location: Mansfield Qld

Industry: Education

Date: October 2010

Spantech was contracted to provide the engineering design, footings, structural steel, roof, insulated ceiling, gutters and downpipes. Read more.

Calvary Christian College

Location: Carbrook Qld

Industry: Education

Date: October 2008

Spantech designed and constructed a 20 x 20 metre shade structure to provide a multipurpose learning area and a safe, weatherproof waiting area at the front of the Carbrook Campus. Read more.

Sports Centre, Lourdes Hill College

Location: Hawthorne, Brisbane, Qld

Industry: Education

Date: December 2013

The striking building designed by Bertoldi Architects features a large covered veranda which overlooks the Brisbane River, the Brisbane Powerhouse, Newfarm Park and the Brisbane CBD. Read more.